Skip to content

RV-14A

Construction Blog and Builder's Resource

  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A

Fuselage structure continued…

Lower gear brace in position, but not yet torqued.

Lower drag fitting in position.

Center section side plates clecoed on and about to be drilled to the upper drag fittings.

Upper drag fittings drilled to center section side plates.

All set for riveting of the forward and center bottom skin overlap area.

Author CorsairPosted on December 10, 2018January 6, 2020Categories Fuselage, SparsTags Bulkhead, Clecoing, Drilling, Fittings, Fuselage, Riveting

Post navigation

Previous Previous post: Fuselage, firewall structure
Next Next post: Fuselage, spar, skins progress

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress