Firewall forward, fuselage continued…

Spinner clecoed on prior to being screwed in place.

GTN 750 tray adjusted very slightly aft, now enabling full seating of all connectors and Comm 1 activation (no longer X’ed out)!!.

Both Comm radios have now been successfully tested for reception and transmission. Each was crystal clear.

Spinner screwed in place. If not for good, at least until painting – unless Vic wants it off for inspection, of course.

Hinge cover assembly seals in process…

Temporary N-numbers in process..

Temporary N-numbers (left-side)…

Temporary N-numbers in process…

Temporary N-numbers (right-side)…

Data plate in process…

Data plate riveted in place for good!

Finish, cowling, empennage progress

Empennage fairing fit, post-initial trim.

Empennage fairing fit, post-initial trim.

Empennage fairing drilled to stabilizers and aft fuselage. The Van’s-suggested method of placing a light under the fairing and trying to spot the holes is a Rube Goldberg solution, at best. Use the right tool for any job, in this case a strap duplicator. Easy-peasy.

Empennage fairing drilled to stabilizers and aft fuselage. The Van’s-suggested method of placing a light under the fairing and trying to spot the holes is a Rube Goldberg solution, at best. Use the right tool for any job, in this case a strap duplicator. Easy-peasy.

Empennage fairing countersunk and nutplate installation underway. Many of the nutplates will be VERY challenging to solid rivet without removing the vertical stabilizer as suggested by the manual. In my case, that’s simply not going to happen. I’m using MK-319-BS pop rivets to attach the nutplates.

Empennage fairing countersunk and nutplate installation underway. Many of the nutplates will be VERY challenging to solid rivet without removing the vertical stabilizer as suggested by the manual. In my case, that’s simply not going to happen. I’m using MK-319-BS pop rivets to attach the nutplates.

Cowl attach hinges and pins underway.

Cowl attach hinges and pins underway.

Cowl attach hinges and pins underway.

This is how far I got when attempting to insert the left-side upper pin. Yes, it was pre-curved and lubricated. Yes, I filed the hinge eyes, though more is probably necessary. The aluminum pin, though, has the integrity of overcooked spaghetti. It may very well get easier as time goes by, but the initial fit – and the pin’s unavoidable tendency to bend – is entirely unacceptable.

I initially intended to use Skybolt Camlocs (as I did with great satisfaction on my first RV), but they were out of stock when I riveted my fuselage-to-firewall skins way back when and I figured I’d try the stock hinges this time around. Yeah, the hinges are a no-go.

I’ll be ordering the Camlocs this week and drilling out the firewall-mounted hinges. I suppose it could be worse, but I’m definitely annoyed. Ugh.

Spaghetti pin…

Firewall forward, empennage in process

Spinner front bulkhead bolts torqued and safety-wired.

Spinner plate assembly and front spinner bulkhead nutplates riveted.

Yes, there’s a little oopsie on one of those holes (a locating magnet failure to accurately locate that pre-drilled hole), but the nutplate isn’t compromised, so I’m not concerned. Onward!

Spinner is done and clecoed in place for the moment. The manual says to install it now with the permanent screws, but a few pages later (in the cowling instructions) it has to come off again, so best to leave the screwing until later. So to speak.

Left empennage gap cover bent and clecoed in place.

Empennage, rudder, horizontal stabilizer, vertical stabilizer continued…

Rudder bottom fairing and taillight complete.

Spinner backing plates ready for installation.

Spinner screw holes drilled up to #19.

Empennage tip fairings and spinner gap fillers ready for installation.

The tip fairings are definitely not perfect, but they’re perfectly airworthy, so I’m fine with moving forward at this point. So far as I’m concerned, getting them perfect falls under paint shop surface prep – and they’ll be paid plenty for the work.

Left horizontal stabilizer tip fairing riveted in place.

Right horizontal stabilizer tip fairing riveted in place.

Vertical stabilizer tip fairing riveted in place.

Spinner plate assembly and front bulkhead drilled for nutplates and countersunk.