Empennage, rudder, horizontal stabilizer, vertical stabilizer continued…

Rudder bottom fairing and taillight complete.

Spinner backing plates ready for installation.

Spinner screw holes drilled up to #19.

Empennage tip fairings and spinner gap fillers ready for installation.

The tip fairings are definitely not perfect, but they’re perfectly airworthy, so I’m fine with moving forward at this point. So far as I’m concerned, getting them perfect falls under paint shop surface prep – and they’ll be paid plenty for the work.

Left horizontal stabilizer tip fairing riveted in place.

Right horizontal stabilizer tip fairing riveted in place.

Vertical stabilizer tip fairing riveted in place.

Spinner plate assembly and front bulkhead drilled for nutplates and countersunk.

Empennage, rudder, horizontal stabilizer, vertical stabilizer underway

Waiting for epoxy to set up after each operation caused some delays this week (plus, my compressor died and had to be replaced), so there are several days of progress represented in today’s update.

All three empennage tip fairings are shown here having received their initial internal flox fillets and fiberglass layups.

One of the spinner gap fillers shown here with its flox fixes in place. They came out pretty nice and should look fine once they’re primed and painted.

The other spinner gap filler shown here with its flox fixes in place. They came out pretty nice and should look fine once they’re primed and painted.

First post-sanding pass at fitting the left horizontal stabilizer tip fairing to clear the elevator counterweight arm.

First post-sanding pass at fitting the right horizontal stabilizer tip fairing to clear the elevator counterweight arm.

First post-sanding pass at fitting the vertical stabilizer tip fairing to clear the rudder counterweight arm.

Taillight installed and Molex connector fitted to the wiring harness.

Lots of micro slathered on in this (hopefully final) step. Some sanding tomorrow and another coat of filler primer should see these puppies ready for riveting. Hopefully.

Empennage, rudder installation

Rudder bottom fairing doubler drilled and clecoed in place.

Rudder bottom fairing doubler center hole cut.

Rudder bottom fairing doubler floxed and riveted in place.

Rudder bottom fairing doubler cleaned of squeezed out flox.

Rudder tip fairing drilled and clecoed in place.

Rudder tip fairing drilled up to final hole size.

Rudder tip fairing riveted in place and ready for flight!

Empennage fairing set in place for an initial fitting. It actually looks quite good – better than expected and much better than the last one I installed back in 2001.