Vertical Stabilizer Underway

All great undertakings have their beginnings in simplicity. In the case of this project, that means drilling the vertical stabilizer spar components together. And so it goes…

Vertical stabilizer spar beginnings…
Vertical stabilizer spar components fully drilled and clecoed in place.
Author CorsairPosted on May 25, 2018December 4, 2019Categories Empennage, Vertical StabilizerTags Empennage, Vertical Stabilizer

Post navigation

Previous Previous post: Getting Ready…
Next Next post: Vertical Stabilizer Progress

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress