Fuselage, ribs progress

All but two of the baggage ribs ready for dimpling.

Last two baggage ribs being primed.

All of the baggage ribs ready for what comes next.

Author CorsairPosted on November 24, 2018January 5, 2020Categories Fuselage, RibsTags Baggage Ribs, Dimpling, Fuselage, Priming, Ribs

Post navigation

Previous Previous post: Fuselage, skins assembly
Next Next post: Fuselage, ribs, construction continued…

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress