Skip to content

RV-14A

Construction Blog and Builder's Resource

  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A

Category: Ribs

Fuselage construction continued…

Fuselage construction continued…

Cover ribs getting some primer.

Forward center section side angles clecoed to forward center section bulkhead.

Forward center section side angles riveted to forward center section bulkhead.

Cover ribs bolted and riveted to forward center section bulkhead.

Author CorsairPosted on November 14, 2018January 4, 2020Categories Fuselage, Ribs, SkinsTags Brackets, Bulkhead, Clecoing, Fuselage, Priming, Ribs, Riveting

Posts pagination

Previous page Page 1 Page 2 Page 3

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress