Elevator Progress…

The elevator horns have been drilled on and various internal components readied for priming.

Author CorsairPosted on June 28, 2018December 14, 2019Categories Elevator, EmpennageTags Elevator, Empennage

Post navigation

Previous Previous post: Elevators Underway…
Next Next post: Elevator Riveting Underway…

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress