Skip to content

RV-14A

Construction Blog and Builder's Resource

  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A

Fuselage, component installation

Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.

Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.

Author CorsairPosted on March 4, 2019January 9, 2020Categories FuselageTags Control Sticks, Fuselage, Pushrod

Post navigation

Previous Previous post: Fuselage, components assembly
Next Next post: Fuselage, components progress

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress