Not too much to see in this partially-opened box, but the prop is in there somewhere…
Air vent components trimmed, clamped, drilled, and marked for further trimming.
Construction Blog and Builder's Resource
Not too much to see in this partially-opened box, but the prop is in there somewhere…
Air vent components trimmed, clamped, drilled, and marked for further trimming.
Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.
Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.
Left side control stick base bolted in place.
Right side control stick base bolted in place.
Autopilot yaw servo installed.
Control stick drilling underway.
Pilot’s control stick drilled to its base.