Skip to content

RV-14A

Construction Blog and Builder's Resource

  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A

Tag: Baffle

Wings, fuel tanks progress continued…

Wings, fuel tanks progress continued…

Right tank aft baffle and zee brackets sealed.

Completed magnetometer mount.

Author CorsairPosted on September 5, 2018January 1, 2020Categories Fuel Tanks, WingsTags Baffle, Fuel Tanks, Magnetometer, Proseal, Wings

Wings, fuel tanks progress continued…

Wings, fuel tanks progress continued…

Fuel level sender fabricated and installed.

Tank baffle sealed and zee brackets riveted. Baffle to skin rivets will be set tomorrow and the tank set aside for a few days to fully cure prior to pressure testing.

Fingers crossed…!

Author CorsairPosted on August 22, 2018December 31, 2019Categories Fuel Tanks, Skins, WingsTags Baffle, Fuel Tanks, Proseal, Riveting, Wings

Posts pagination

Previous page Page 1 Page 2 Page 3

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress