Skip to content

RV-14A

Construction Blog and Builder's Resource

  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A

Wings, flaps progress

Left flap top skin riveted.

Left flap top skin riveted.

Left flap bottom skin clecoed.

Left flap bottom skin riveting in progress.

Left flap bottom skin riveting in progress.

Author CorsairPosted on October 4, 2018January 2, 2020Categories Flaps, Skins, WingsTags Bottom Skins, Clecoing, Flaps, Riveting, Skins, Top Skins, Wings

Post navigation

Previous Previous post: Wings, flaps assembly
Next Next post: Wings, flaps continued…

Recent Posts

  • Flying
  • Flying
  • Airworthiness Inspection!
  • Final assembly activities continued…
  • Final assembly activities

Categories

Tags

  • Ailerons (15)
  • Bottom Skins (31)
  • Brackets (14)
  • Bulkhead (23)
  • Camlocs (15)
  • Canopy (43)
  • Clecoing (85)
  • Countersinking (12)
  • Cowling (23)
  • Deburring (13)
  • Dimpling (20)
  • Doublers (15)
  • Drilling (39)
  • Elevator (20)
  • Empennage (57)
  • Fairings (17)
  • Fiberglass (13)
  • Finish (69)
  • Firewall (13)
  • Firewall Forward (56)
  • Flaps (12)
  • Fuel Tanks (20)
  • Fuselage (122)
  • Horizontal Stabilizer (20)
  • Ken (14)
  • Lights (12)
  • Masking (13)
  • Nutplates (13)
  • Painting (16)
  • Panel (29)
  • Priming (38)
  • Proseal (19)
  • Pushrod (14)
  • Ribs (32)
  • Riveting (118)
  • Rudder (14)
  • Skins (70)
  • Spars (22)
  • Stiffeners (17)
  • Tailcone (23)
  • Top Skins (15)
  • Vertical Stabilizer (12)
  • Wings (100)
  • Wingtip (14)
  • Wiring (44)
  • N114KB Project Updates
  • Articles
  • Pieces of Mind
RV-14A Proudly powered by WordPress