Left wing flap and aileron gap fairings riveted in place.
Magnetometer connector wired. Nine little, tiny DB terminals…fun!
Construction Blog and Builder's Resource
Left wing flap and aileron gap fairings riveted in place.
Magnetometer connector wired. Nine little, tiny DB terminals…fun!
Left tank permanently (hopefully!!) installed on the wing.
Left tank permanently (hopefully!!) installed on the wing.
Left wing wiring underway…
Left wing wiring underway…
Right tank aft inboard rib and tank support bracket riveted.
Left tank pressure test successful.
Right tank fittings installed.
Right tank rivet shop heads and inboard rib & tank support bracket openings sealed.
Right tank ribs fully riveted.
Right tank aft inboard rib and tank support bracket sealed in place. Vent line fabricated and installed.