Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.
Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.
Construction Blog and Builder's Resource
Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.
Control sticks temporarily installed and stick link pushrod (joining stick bases) permanently attached.
Left side control stick base bolted in place.
Right side control stick base bolted in place.
Autopilot yaw servo installed.
Control stick drilling underway.
Pilot’s control stick drilled to its base.
Elevator bellcrank assembly installation in progress, also known as ‘fun in the tailcone’…NOT!!
Yaw servo mount riveted to aft face of #7 bulkhead. That’s RV-14A for “nearly inaccessible”.
Main fuselage harnesses laid out for the first time. That’s a lotta wires…
Autopilot pitch servo installed.
Autopilot pitch & yaw servo wiring harness installed.
The single loose wire is the ground for both servos and is now installed. The other connector is for the autopilot yaw servo and will be connected this weekend when I get the other servo mounted.