P-mag ground wire now terminated and connected to an engine case bolt.
Right-side ignition lines and EGT wires neatened. Oil cooler SCAT duct installed along with manifold pressure hoses. Final connection to P-mag to be made after that last backup alternator nut is finally tightened once the special Snap-on tools arrive next week.