Firewall forward progress

P-mag ground wire now terminated and connected to an engine case bolt.

Right-side ignition lines and EGT wires neatened. Oil cooler SCAT duct installed along with manifold pressure hoses. Final connection to P-mag to be made after that last backup alternator nut is finally tightened once the special Snap-on tools arrive next week.

Firewall forward connections in process

P-mag connector all wired up and ready to install.

P-mag connector and manifold pressure connection installed.

For access-related reasons, I wanted to get this out of the way before installing the backup alternator on the empty vacuum pad at the top of this image.