Firewall forward, finish, cowling progress

Snorkel marked for initial trimming to air filter frame.

Snorkel marked for initial trimming to air filter frame.

Snorkel marked for initial trimming to fuel servo.

Snorkel being reformed (via heat gun and pressure (I used both the beer bottle and hammer handle)) to clear the Cylinder 2 intake tube.

Air filter frame and snorkel drilled together in final position.

Air filter frame and snorkel floxed together.

Upper cowling interior coated with epoxy resin.

Lower cowling interior coated with epoxy resin.

Empennage fairing interior coated with epoxy resin