Fuselage, flap system progress

Extended rudder cable links installed. I only cotter-pinned the forward connections, as they won’t be changing. I’ll do the aft connections during final assembly once the rudder is on the plane and I can confirm full control movement.

Right-side rudder cable guides in place.

Left-side rudder cable guides in place.

Flap actuation system in process – torque arms being drilled to the flap crank.