N114KB Project Updates

Wings, flaps assembly

Right flap disassembly in progress…

Right flap component priming…

Right flap nose and top skin clecoed to structure for riveting.

Right flap nose and top skin clecoed to structure for riveting.

Right flap nose and top skin clecoed to structure for riveting.

Wings, flaps, spar

Left flap weighted while trailing edge temporary adhesive sets.

Left flap trailing edge rivets top half set. They’re done double-flush, so one half at a time.

Bronze bushings pressed into left wing flap hinge brackets.

Left flap complete. Ready to go into the house for the duration.

Right wing main spar now in the garage awaiting its turn…