Final assembly progress

Right wing bolts torqued and sealed. Ready for flight.

Left wing bolts torqued and sealed. Ready for flight.

Right wing tank-fuse side fuel line installed. Ready for flight.

Left wing tank-fuse side fuel line installed. Ready for flight.

Flaps adjusted – down position. Ready for flight.

Flaps adjusted – up position. Ready for flight.

G3X PFD position updated. I got the ADSB working after this photo; it’s now ready for flight. Less the various still-to-be-calibrated functions, of course.

G3X MFD position updated. I got the ADSB working after this photo; it’s now ready for flight. Less the various still-to-be-calibrated functions, of course.

Right wing nav light, strobe, and landing light ready for flight.

Left wing nav light, strobe, and taxi light ready for flight.

G3X PFD configuration mode system information page. All green checkboxes now that the Can bus is complete and updated. Ready for flight.

G3X PFD configuration mode system information page. All green checkboxes now that the Can bus is complete and updated. Ready for flight.

Wings, flaps mounting underway

Despite having to drive down to Sarasota today to visit my mother-in-law, I had to get something useful done on the project this morning before leaving. So…I mounted the left flap.

While that might not seem like much, it means that the left wing is now ready to temporarily mount on the fuselage. I’m aiming for late afternoon tomorrow, once some assistants become available. Standby…

Right flap now mounted to its wing which, itself, is ready to temporarily mount on the fuselage.

Unfortunately, I don’t have the space (despite having a 3-car garage dedicated to the project) to mount both wings simultaneously, so it’ll be one at a time with any remaining tweaks to be done at the hangar during final assembly sometime this fall.

Wings, flaps progress

Right flap bottom skin fitting for riveting.

Right flap bottom skin riveted to spar.

Right flap awaiting trailing edge installation.

Right flap trailing edge clecoed in place and ribs ready to be riveted to bottom skin.

Right flap trailing edge ready for riveting.

Right flap completed and ready to head into the house for the duration.